This is a plain painting contract for home jobs, inside or outside. It covers what gets painted, the prep, the paint, what is not included, how you get paid, what happens when the weather or the house changes the plan, a warranty line and the customer's right to cancel. Print it, or copy it into a document and make it yours.
It is written in plain words on purpose. A customer who understands the contract is a customer who is less likely to argue about it later.
Use it with a painting estimate: the estimate lists the rooms, paint and price in detail, and this contract holds the terms. If you need to get a deposit sized, see Deposits for contractors.
To use it: print this page with your browser's Print command (Ctrl+P or Cmd+P). The printout shows only the contract. Or select the contract below and paste it into Word or Google Docs. A plain text version for email is further down.
How to fill it in
- Fill in the parties. Your business name as it appears on your license and insurance, and the customer's name as it is on the deed or lease. For a rental, get the owner's written OK.
- List the work room by room. One row per room or surface, and what gets painted: walls, ceiling, trim, doors. Say how many coats. Attach your estimate if the list is long.
- Write the paint down. Brand, product line, color and sheen for each surface. Get the customer to approve the color in writing before you buy.
- List the prep and what is not included. If it is not on the page, it is a dispute later.
- Check the age of the house. If it was built before 1978, the lead-safe rules may apply (see below). Tick the box and fill in the date the customer received the EPA pamphlet.
- Set the money. The total, the deposit, any middle payment and the final payment. Round the numbers.
- Fill in your warranty, or cross it out. Write only what you will honor.
- Decide your cancellation and late-fee lines. Fill in the amounts, or cross the clauses out. Check your state's rules first.
- Sign it, both of you, and give the customer a copy.
The contract
Painting contract
Between the contractor and the customer named below. Fill in every blank. Cross out anything that does not apply.
The parties
Home built: ☐ before 1978 ☐ 1978 or later ☐ not sure
1. The work
The contractor will paint the following. Anything not listed is not included.
| Room or surface | What gets painted | Coats | Notes |
|---|---|---|---|
2. Preparation
☐ Move and cover furniture and floors
☐ Wash or clean surfaces
☐ Scrape and sand loose paint
☐ Fill small holes and cracks
☐ Caulk gaps
☐ Spot prime bare spots
☐ Prime all surfaces
☐ Other: ____________________
3. Paint
| Surface | Brand and product | Color name or number | Sheen |
|---|---|---|---|
| Walls or siding | |||
| Ceilings | |||
| Trim | |||
| Doors | |||
| Primer |
The customer approved the colors on . A color that looks different on the wall than on a sample is not a defect.
4. Not included
☐ Repairing rot, damaged drywall or large cracks
☐ Wallpaper removal
☐ Moving heavy furniture or items on walls
☐ Painting inside closets or cabinets
☐ Other: ____________________
Extra work, if the customer approves it in writing, is dollars per hour plus materials.
5. Price and payment
| Payment | Amount | Due |
|---|---|---|
| Deposit | $ | When this contract is signed |
| Second payment (optional) | $ | |
| Final payment | $ | On completion and walk-through |
Total price: $. The price includes labor and the materials listed above. The customer pays by: ☐ check ☐ cash ☐ card ☐ bank transfer.
6. Schedule and weather
Exterior work depends on weather and on the temperature and drying limits on the paint maker's data sheet. If weather stops the work, the dates move. The contractor will tell the customer before moving a date. A weather delay is not a breach of this contract.
7. Changes to the work
Any change to the work, price or schedule must be written down and signed by both people before the extra work starts, on a change order or in a signed message. Without that, the price and scope in this contract stay as they are.
8. Hidden conditions
If the contractor finds something that was not visible when the price was set, such as rot, water damage, lead paint where none was expected or failing surfaces underneath, the contractor will stop that part, tell the customer and give a price for fixing it. The customer decides whether to approve it.
9. What the customer does
- Gives access to the work areas on the planned days and keeps pets and children out of them.
- Clears small valuables, breakables and wall hangings, unless the contractor has agreed to move them.
- Provides water and power if the work needs them.
- Chooses colors and products before the start date.
10. Lead-safe work
If the home was built before 1978, the contractor will follow the EPA's lead-safe work rules, and the customer confirms they received the EPA's lead hazard pamphlet before work started. Date received: .
11. Finishing the job
When the work is done, the customer and the contractor will walk the job together. The customer will list anything missed or wrong within days. The contractor will fix those items in a reasonable time. The contractor cleans up and takes away debris.
12. Warranty
The contractor will repair paint that peels, blisters or flakes because of how it was applied, for year(s) after the final payment. This does not cover damage from moisture or leaks, wood or surface movement, cracks from settling, fading, wear or abuse, or work done by someone else.
13. Right to cancel
If this contract was signed at the customer's home or any place other than the contractor's business, the customer may have the right to cancel it within three business days. A separate Notice of Cancellation, if required, comes with this contract. State rules may add to this. If the customer cancels after that period and before work starts, the contractor keeps $ for materials ordered and time held.
14. If payment is late
Money not paid within days of when it is due may carry a late fee of , if the law allows it.
15. If there is a problem
Each person will tell the other in writing and give a fair chance to fix it before taking any other step.
16. The whole agreement
This contract, with any estimate attached to it and any signed change orders, is the whole agreement. It can be changed only in writing, signed by both people.
Not legal advice. Have a local attorney review this contract before you use it.
Each clause explained
The parties and the property
Use your legal business name, and your license and insurance details if your state asks for them. Put the property address, not only the mailing address. If the person signing is not the owner, such as a tenant or a property manager, get the owner's written approval.
The work, prep and paint
Most painting disputes start here. The room-by-room table lets a customer drop a room without redoing the contract. The prep list says what you do before you paint, and the not-included list says what you do not do. Naming the product, color and sheen stops the argument that the paint is not what was promised. The color approval line covers the other common one: a color that looks different on the wall than on a sample card.
Price and deposit
Say the total, the deposit and when each payment is due. The deposit covers what you spend before the customer sees any work and holds a spot on your schedule. Some states cap what you can take up front. California, for example, limits home improvement deposits to the lesser of $1,000 or 10% of the contract price. See Deposits for contractors for how to size one and the state limits we could confirm.
Schedule and weather
Exterior paint and stain have temperature and dry-time limits on the maker's data sheet. If rain or cold stops you, you need the right to move the date without being in breach. This clause says the dates move and promises to tell the customer first. Do not promise a finish date you cannot control.
Changes and hidden conditions
Two clauses protect your margin. The change clause says no extra work starts without a written yes, so a "while you are here" request does not turn into free work. Use the change order form to write it down. The hidden conditions clause covers the rot behind the trim or the layers of peeling paint no one could see. You stop, you quote the fix, they decide.
Lead-safe work
If the home was built before 1978 and your work disturbs painted surfaces above the EPA's small-job limits (more than 6 sq ft per room inside or more than 20 sq ft outside), the EPA's Renovation, Repair and Painting rule applies. The small-job limit never covers window replacement, demolition, or prohibited practices such as open-flame burning or power sanding without HEPA dust collection. Your firm must be EPA certified, and you must give the owner the lead hazard pamphlet before work starts and keep a record that they received it. Many states run the program themselves. See the EPA contractor page. This template has a line for the pamphlet date, not the forms themselves.
Finishing and the walk-through
A final walk with a short list of fixes, and a time limit to raise them, lets you finish the job instead of getting calls for months. Get the final payment when the list is done.
Warranty
Write only what you will actually do, and for how long. A typical workmanship warranty covers peeling and blistering caused by how the paint was applied, and leaves out moisture, movement in the wood, fading and wear. If you give none, leave the clause blank or cross it out. Do not copy a promise you will not keep, because a warranty you do not honor is worse than none.
The right to cancel
If you sign a contract at the customer's home, the FTC's Cooling-Off Rule (16 CFR Part 429) generally gives the customer three business days to cancel. You have to tell them about it, both out loud and in writing, and give them a cancellation form in duplicate. There are exceptions, and the dollar thresholds and details matter, so read the FTC's rule page and ask your attorney. Many states have their own home improvement cancellation rules too. The contract has a line for what you keep if the customer cancels after the cancel period but before you start. Check that your state allows it before you rely on it.
Late payment and disputes
A late fee has to be allowed by your state and agreed in advance. If you do not want one, cross it out. The dispute clause is deliberately light. It asks both sides to put problems in writing and allow time to fix them, which settles most problems. Whether you want arbitration, a venue or a lawyer's fees clause is a question for your attorney.
Insurance, licensing and notices
Your state may require your license number, a lien warning, a statement about a recovery fund, or a notice in large print on the contract. Check your state contractor board's rules. This template cannot know which ones apply to you.
A text version for email
Copy this into an email and fill in the blanks. It is shorter, so attach the estimate.
PAINTING CONTRACT
Contractor: ________ Phone/email: ________ License #: ________
Customer: ________ Phone/email: ________
Property: ________ Date: ________
Home built: before 1978 / 1978 or later / not sure
1. WORK: (rooms or surfaces, what gets painted, coats)
See attached estimate #____.
2. PREP: (wash, scrape, sand, fill, caulk, prime)
3. PAINT: (brand, product, color, sheen). Colors approved on ____.
4. NOT INCLUDED: rot or drywall repair, wallpaper removal,
moving heavy items, closets (unless listed).
Extra work: $___ per hour plus materials, approved in writing.
5. PRICE: Total $____. Deposit $____ when signed.
Final $____ on completion and walk-through.
6. SCHEDULE: start ____, about ___ days. Weather may move dates;
we will tell you first.
7. CHANGES: written and signed by both of us before extra work.
8. HIDDEN CONDITIONS: if we find rot, water damage or similar, we
stop that part, give a price to fix it, and you decide.
9. YOU: give access, keep pets and children out of work areas,
clear small valuables, choose colors before the start date.
10. LEAD: if built before 1978 we follow the EPA lead-safe rules
and you confirm you got the EPA pamphlet on ____.
11. WALK-THROUGH: you list anything missed within ___ days.
12. WARRANTY: (what you will honor, and for how long)
13. CANCEL: if signed at your home you may have 3 business days to
cancel. (Add your state's required notice.)
14. LATE PAYMENT: (fee, if allowed by law)
15. This and any signed change orders are the whole agreement.
Reply "agreed" with your full name to accept, or sign below.
Contractor: ________ Customer: ________ Date: ________
An email reply can count as agreement in many places, but a signature is stronger. Ask your attorney what is enough in your state.
Tips for using it
- Attach the estimate. The contract holds the terms and the estimate holds the details. Both together are the agreement.
- Initial every page, and give the customer a copy. A copy they have seen and kept is hard to argue with.
- Take photos first. Cracks, stains and existing damage are easier to agree on with a photo.
- Offer choices as separate lines. Put ceilings, a second color or closets on the estimate as optional lines, so each is a clear yes or no.
- Keep it short enough to read. A contract nobody reads protects nobody. If a clause does not matter to your jobs, take it out.
- Update it once a year. Your costs, warranty and local rules change.
- Add a written warranty. See the workmanship warranty template.
Using Chalk instead of paper
You do not need Chalk to use this template. If you would rather do it on a phone, Chalk puts your terms on the quote. Your usual terms live under Settings > Documents, and each quote has a Terms for this quote box you can edit. The customer opens the quote on their phone, approves it with a finger signature, and the deposit you set is collected when they approve. See Send a quote and get it approved for the steps.
A signed approval in Chalk is not a substitute for a contract your attorney has reviewed. Paste your reviewed clauses into your terms and keep your lawyer's wording.
Sources
- U.S. EPA, Renovation, Repair and Painting program for contractors: certification, the pre-1978 rule, the 6 and 20 sq ft limits and the lead hazard pamphlet.
- Federal Trade Commission, Cooling-Off Period for Sales Made at Home or Other Locations (16 CFR Part 429): the three-business-day right to cancel for sales made away from the seller's place of business.
- Our guide, Deposits for contractors: state deposit limits, including California's.