A change order is a short, signed note that says what changed on a job and what it does to the price and the schedule. It is the difference between "I thought you'd do that for free" and "I said yes to that, and here is what it costs." This page has a plain change order for small residential jobs, a text version for a quick yes by email, and tips on getting the yes before the work, not after.
To use it: print this page with your browser's Print command (Ctrl+P or Cmd+P). The printout shows only the form. Or select the form below and paste it into Word or Google Docs.
When you need one
Use a change order any time the customer and the contract no longer match. The common ones:
- The customer asks for more. An extra room, a second coat, a gate, a deck rail. This is the most common change, and the easiest to let slide.
- The customer asks for less. A room dropped. Write it down so the credit is clear.
- You find something hidden. Rot behind the trim, a water stain, a surface that will not take paint. It was not in the price, and it is not yours to eat.
- Materials change. The customer picks a different product, color or finish.
- A code or inspection requirement shows up.
- The schedule moves for a reason on the customer's side. For example, they ask you to hold off a week.
You do not need a form for every small thing. Decide a line in advance, such as "anything over an hour or $100 gets a written change order," and put it in your contract. A short text or email the customer replies "yes" to is better than nothing. A signed form is better than a text.
How to fill it in
- Number it and tie it to the contract. A running number, the date, and the number and date of the original contract or estimate. Then nobody has to guess what it changes.
- Describe the change in plain words. What is added, removed or different, where and how. Specific beats short: "Paint the north garage wall, two coats, same color as the house" not "Garage."
- Say why. A tick box is enough. It matters later if there is a disagreement about whether something was extra.
- Price it line by line. Labor, materials and any rental, with quantity and unit price. Add your margin the same way you did on the original. The markup and margin calculator shows the difference between the two.
- Show the running total. The original price, any earlier change orders, this change, and the new total. The customer should see the new number before they sign.
- State the time. Whether it moves the finish date, and by how long.
- Say how it is paid. Added to the final bill, a deposit now, or paid when signed. For a big change, ask for money up front.
- Get both signatures before you start the work. Date them. Give the customer a copy.
The form
Change order
A change to the original contract. Work on this change starts only after both people sign.
What is changing
Why: ☐ Customer request ☐ Hidden condition found ☐ Change in materials ☐ Inspector or code requirement ☐ Other: ____________
Price of this change
| Description | Qty | Unit | Unit price | Amount |
|---|---|---|---|---|
| Running total | Amount |
|---|---|
| Original contract price | $ |
| Earlier change orders (total, add or subtract) | $ |
| This change order (add or subtract) | $ |
| New contract total | $ |
Sales tax on this change, if it applies: $.
Time
☐ No change to the schedule ☐ Adds working days. New expected finish: .
How this change is paid
☐ Added to the final payment
☐ Deposit of $__________ due when this is signed
☐ Paid in full when this is signed
All other terms of the original contract stay the same.
A text version for email
Use this when you need a quick yes by email or text. It is not as strong as a signature, but it is a record.
CHANGE ORDER #____ for (contract/estimate #____ dated ______)
Customer: ________ Property: ________
What is changing:
(plain description of the work added, removed or changed)
Price of this change: $____ (add / subtract)
Original contract: $____
Earlier change orders: $____
New contract total: $____
Schedule: no change / adds ___ working days (new finish ______)
Payment: added to final bill / $____ due now
All other terms of our contract stay the same. I will start this
work once you reply "approved" with your name.
Tips: get the yes before the work
- Say the price out loud, then write it. The best time to agree is while you are standing there. Then write it down the same day.
- Do not start until it is signed. Work done on a "probably" is the work you end up arguing about. If it is urgent, a text with a clear yes is fine.
- Charge for the change the way you charged for the job. If you add margin to the contract price, add it here too. Free extras teach customers to ask for more.
- Include the time. An added room is also an added day. Customers often forget the delay, and then blame you for it.
- Keep them in one place. Staple them to the contract or save them with the job, so the final invoice matches the total.
- Match the invoice to the new total. The last bill should be the original price plus the signed changes, and nothing else. See the invoice template.
- Credits count too. If the customer drops something, write the credit so the final bill is right.
Using Chalk
You do not need Chalk to use this form. Chalk does not have a change order feature. There is no separate change-order form or running total in the app.
What you can do in Chalk is make a new quote for the change. Open the original quote, press More, then Duplicate. That copies the quote into a fresh draft with its own number. Change the lines so they cover the added work, set any deposit, and send it. The customer opens it on their phone and approves it, with a signature, the same way they did the original. You then have a dated, signed approval for the change.
Two things to know. The new quote is its own quote, with its own number and its own approval, so keep track of how it ties to the original job. And a quote that was already approved can be unlocked with Edit quote, but the customer's signature was for the old numbers, so a new quote and a fresh approval is the cleaner record. See Send a quote and get it approved for how sending and approval work.
Sources
- This is a general template. It cites no law because change order rules come from your state and your contract. Ask a local attorney or your state contractor board.
- Chalk behavior is from the app itself: Duplicate copies a quote into a new draft with a new number, and approval is by the customer on their phone.