A handyman's problem is not that the work is hard. It is that every job is small, different and full of surprises. A faucet swap is two hours until the shutoff valve will not close. A TV mount is one hour until the wall is plaster and lath. If you price everything by the hour, customers hate not knowing the number. If you price everything flat, one bad job eats the profit from four good ones.
This guide shows how to work out your hourly rate from your real costs, when flat rate wins and when it bites, how to turn common tasks into flat prices, what trip and minimum charges look like, how to mark up materials, and what a five-task visit looks like priced both ways. It ends with a starter price list you can adapt.
What homeowners see online
Cost guides give customers a range, and they vary a lot. Here are two that homeowners read:
| What | Fixr (updated January 30, 2025) | HomeAdvisor (updated June 19, 2026) |
|---|---|---|
| Hourly | $50 to $100, most about $65 | $50 to $150 |
| Minimum charge | $130 is the most common, often for jobs of 30 minutes or less | Not listed |
| Trip fee | No dollar figure. Some handymen bill from when they leave home instead | No dollar figure. Some include travel within an area, then charge mileage |
| TV mounting | $300 to $400 | $150 to $350 |
| Light fixture | $80 to $150 | $65 to $250 |
| Ceiling fan | $100 to $300 | Not listed |
| Bathroom faucet, labor only | $60 to $150 | Minor plumbing $200 to $300 |
| Furniture assembly | Not listed | $90 to $150 |
| Small drywall hole | $125 to $175 | Not listed |
Neither one publishes a materials markup.
For wages, the U.S. Bureau of Labor Statistics put median pay for general maintenance and repair workers at $23.84 an hour in May 2025. That covers employees, many of them in building maintenance, so it is a reference for what labor costs, not for what you charge.
Your market sets the ceiling. Your costs set the floor.
Start from your hourly rate
Work out your rate before you price any job. The step most handymen skip is billable hours.
You are not paid for every hour you work. Drive time, shopping for parts, quotes, invoicing, phone calls and cleanup are real work you cannot bill by the hour. If only 60% of your paid hours are billable, your cost per billable hour is higher than your wage.
Price per billable hour = (wage + burden) / billable share / (1 - overhead % - profit %)
With placeholders:
| Item | Amount |
|---|---|
| Wage $25 plus 30% burden | $32.50 per paid hour |
| Billable share | 60% |
| Cost per billable hour | $32.50 / 0.60 = $54.17 |
| Overhead 20% and profit 15% of price | divide by 0.65 |
| Price per billable hour | $83.33, call it $85 |
Billable share is the lever. At 75% billable the same math gives $32.50 / 0.75 / 0.65 = $66.67. Booking jobs close together, bundling tasks and having a good quoting routine all raise it.
If $85 is above what your area pays, you have a real decision: raise your billable share, cut your overhead, or accept a smaller profit. Do not just lower the rate and hope. The hourly rate calculator and How to figure your hourly rate walk through the same math with your own numbers.
When flat rate wins and when it bites
| Hourly | Flat rate | |
|---|---|---|
| Customer experience | Open number. Some customers hate it. | A number they can say yes to |
| When the job runs long | The customer pays more | You absorb it |
| When the job runs short | The customer pays less | You keep it |
| Rewards | Slow work | Fast, skilled work |
| Good for | Unknown scope, repairs, troubleshooting | Tasks you have done many times |
| Dangerous for | Customers who feel it as a blank check | Anything where you cannot see inside the wall |
The rule that works: flat-rate the tasks you have timed, hourly the tasks you cannot see. A TV mount on a drywall wall, a door handle swap, a light fixture on an existing box and furniture assembly are flat-rate tasks. A leak, a squeaky floor, a circuit that trips and "something is wrong with the door" are hourly. Put a cap on hourly: "I will call you before we pass three hours."
Turn tasks into flat prices
Time each task on 5 or 10 jobs and use your average. Then add a risk buffer, because some jobs will run long and the flat price has to carry them:
Flat price = average hours x hourly rate x (1 + buffer)
A 15% buffer is a fair start. Round to the nearest $5.
| Task | Average hours | Flat price at $85, 15% buffer |
|---|---|---|
| Mount a TV on drywall, hide the cable | 1.5 | $145 |
| Replace a kitchen faucet | 2.0 | $195 |
| Replace door hardware (knob or lock) | 0.75 | $75 |
| Replace a light fixture on an existing box | 1.0 | $100 |
| Assemble a dresser or bookcase | 1.5 | $145 |
These exclude your trip charge and any materials. Next to the ranges above, the light fixture and the dresser land inside them, and the TV mount sits just under HomeAdvisor's $150 to $350. Add your trip charge and it lands in the same neighborhood: a TV mount at $145 plus a $45 trip is $190, inside that range.
Keep a price list on your phone and in the price book (see the Chalk section). Update it every January with your actual hours.
Minimums and trip charges
Trip charge. Cover the drive to the job and back. For half an hour of drive at the placeholder rate of $83.33, that is $41.67 before vehicle cost, so $45 is a fair number in this example. Neither cost guide above gives a trip fee in dollars. Fixr notes that a handyman with no minimum may bill from when they leave home instead.
Minimum service charge. One hour of work plus the trip: $85 + $45 = $130. Fixr says $130 is the most common minimum, so this lands right on it. A minimum is not rude. It is the price of showing up.
Bundling waives it. When a customer books five tasks in one visit, they pay one trip charge, not five. That is the biggest saving a customer can get from you, and it costs you nothing, because you drive once.
Materials markup
Customers pay for the time you spend finding, buying and carrying parts, and for the risk of a part that is wrong. Mark materials up. The cost guides do not publish a markup, so pick one that pays for that time and risk, and check the margin it gives you.
Be careful with the words. A 30% markup on a $24 part is $31.20 and gives you a 23% margin, not 30%. If you want a 30% margin on materials, mark them up by 43%. The markup and margin calculator shows the difference.
Rules that save arguments:
- Customer-supplied materials. Your time is the same. Say you do not warranty the part.
- Receipts. Keep them and show them if asked.
- Big purchases. For a $400 fixture, ask for the money up front or buy it with a deposit. See Deposits for contractors.
- Returns. If a part is wrong and you have to go back, whose time is that? Decide before the job.
Worked example: a five-task visit
The visit: a customer books five tasks: mount a TV, replace a kitchen faucet, replace a door lock, replace a light fixture and assemble a dresser. Materials are $24 of anchors, caulk and small parts, marked up 30%. One trip.
Placeholders: $85 an hour, a $45 trip charge and a 15% flat-rate buffer, from the sections above.
Priced by the hour.
| Item | Amount |
|---|---|
| 6.75 hours x $85 (1.5 + 2.0 + 0.75 + 1.0 + 1.5) | $573.75 |
| Trip charge | $45.00 |
| Materials, $24 + 30% | $31.20 |
| Total | $649.95, call it $650 |
Priced flat.
| Task | Flat price |
|---|---|
| TV mount | $145 |
| Faucet | $195 |
| Door lock | $75 |
| Light fixture | $100 |
| Dresser | $145 |
| Tasks subtotal | $660 |
| Trip charge | $45 |
| Materials, $24 + 30% | $31.20 |
| Total | $736.20, call it $736 |
The flat price is $86 higher than the hourly price. That gap is the 15% buffer ($573.75 x 1.15 is $659.81, rounded task by task to $660). The customer is paying for a number they can count on.
What your day looks like under each price.
| Actual hours | Flat price for the tasks | Your effective hourly rate | Hourly billing for the tasks |
|---|---|---|---|
| 5.0 (fast) | $660 | $132 | $425 |
| 6.75 (as planned) | $660 | $97.78 | $573.75 |
| 8.25 (the faucet takes 3.5 hours, not 2.0) | $660 | $80.00 | $701.25 |
When the faucet fights back, the hourly customer pays $127.50 more, and the flat customer pays nothing more. The flat price is the right choice for tasks you know. If the faucet is a mystery (old supply lines, a corroded valve), price it hourly with a cap, and flat-price the rest.
Bundle small jobs
Bundling is the main way handymen raise their billable share. A few habits:
- Ask what else. At the quote, ask "what else is on your list?" Most customers have a list.
- Offer a half-day or full-day rate. Some customers prefer a known day price for a list of small things. Compute it as hours x rate with no buffer, and cap the tasks.
- Schedule by neighborhood. Three jobs on one street in a day is worth more than one job on each side of town.
- Hold the minimum for single tasks. A single task still needs the trip and the minimum.
Licenses, insurance and limits
Most states limit what a handyman can do without a contractor's license. Some cap the dollar value of a job, and almost all treat electrical and plumbing work differently from carpentry and painting. Check your state's rules before you advertise a service, and keep to them on the quote. Carry general liability insurance, and ask your agent whether it covers the work you do. This is not legal advice.
Mistakes to avoid
- Using your wage as your rate. Drive, shopping and quoting are unpaid unless the rate pays for them.
- Flat-pricing something you cannot see. Inside a wall, under a floor, behind a fixture.
- No trip charge or minimum.
- Giving away the second hour. Short tasks add up to a lost day.
- Marking up by the margin you want. See the markup and margin section.
- Hiding the price of a task until the end. Say the number before you start.
- Not recording hours. Your flat prices are only as good as your last ten jobs.
- Doing electrical or plumbing work outside your license.
How Chalk helps
This part is about our software.
- Price book. Add each flat-rate task to the price book as an item with the unit each, and add an hour item for your hourly rate, your trip charge and your minimum. When you build a quote, pick them onto lines in a tap and change the quantity. The unit list also has sq ft, lin ft, gallon and room. See Send a quote and get it approved.
- Starter names. Under Settings > Price book, Add starter names adds common item names for your trade. It does not set any prices, so you still set your own.
- Quote templates. Save a common visit (say, "TV mount and cable cover") as a quote template under Settings > Quote templates, so common jobs start half built.
- Optional extras. Mark a haul-away or a second task as an Optional extra so the customer ticks what they want.
- Margin on each item. The price book shows each item's price, cost and margin once you fill in what it uses, and shows a margin under 40% in red.
- Deposit. Ask for a deposit on the quote as a dollar amount or a percent, which covers the fixture you buy.
Sources
Prices and rates change and vary by region. Check the current version of each source.
- Fixr: handyman cost, updated January 30, 2025.
- HomeAdvisor: handyman rates, updated June 19, 2026.
- U.S. Bureau of Labor Statistics: general maintenance and repair workers, May 2025 data.