Pricing guide

How to price epoxy garage floors

Price epoxy and flake garage floors by the square foot: grinding, repairs, material math from the data sheet, labor and a worked two-car example.

Adrian GluchowskiOwner of Superior Stain Solutions, builder of ChalkLast reviewed 11 min read

On this page

An epoxy floor looks like the easiest money in finishing: a flat surface, one product, one afternoon. Then the grinder breaks, the slab has oil in it, the cracks are worse than they looked, and the moisture test says come back next month. The contractors who make money on garage floors price the prep and the risk, not just the coating.

This guide covers how to measure, what prep to price, how to turn a data sheet into gallons, how to price labor, and how to arrive at a square-foot price that covers overhead and profit. It ends with a worked two-car example.

What homeowners see online

Fixr's guide to concrete floor coatings (updated January 2025) says:

WhatFixr's number
Epoxy garage floor, installed$10 to $15 per sq ft
A two-car garage (about 575 sq ft)$5,750 to $8,625
Epoxy materials$30 to $150 per gallon
Polyaspartic (a premium option)$5 to $10 per sq ft
Primer, installed$2 to $4 per sq ft
Small concrete repairs / larger repairs$3 to $5 / $10 to $15 per sq ft
Basic resurfacing$4 to $10 per sq ft

Other cost guides publish much lower ranges, which tells you the label "epoxy floor" covers very different work: a thin roll-on kit, a flake system, a polyaspartic topcoat. Price the system you actually install.

Step 1: Measure and inspect

  • Area. Length x width, minus anything that stays uncoated. Add steps, a stem wall or a utility room if they are in the scope.
  • The slab. Look for oil stains, cracks, spalls, expansion joints, old paint or sealer, and whether it has ever been coated. Photograph all of it.
  • Moisture. Concrete that is still curing or has vapor coming through will fail a coating. Sherwin-Williams' ArmorSeal 1000 HS data sheet says concrete must be cured at least 28 days at 75 F and lists a moisture vapor test (ASTM F1869). Fixr suggests waiting longer for new slabs: it says to wait at least six months before coating new concrete. Follow the data sheet for your product.
  • Conditions. Temperature, humidity, whether the garage can be cleared, who moves the cars, and access to power and water.

Step 2: Price the prep

Prep is most of the cost and most of the risk.

Prep stepWhyPrice it as
Grind the slabThe ArmorSeal data sheet calls for ICRI concrete surface profile CSP 1 to 3. Check what your product needs.Hours, plus diamond tooling
Fill cracks, joints and spallsRepairs are not part of the coating.Hours and material, or by the foot
Remove oil or old coatingsA coating will not bond to oil.Hours, extra if heavy
Moisture testThe data sheet lists one.A fee or a line item
Vacuum and cleanDust ruins the base coat.Hours

Step 3: Material math

Start with the data sheet for the system. Most coatings are sold by volume, and the film thickness decides how far a gallon goes.

Coverage (sq ft per gallon) = 1,604 x volume solids / dry film thickness in mils

A gallon of a 100% solids coating covers 1,604 sq ft at 1 mil (0.001 inch), because a gallon is 231 cubic inches. At 12 mils it covers about 134 sq ft. Sherwin-Williams' ArmorSeal 1000 HS is 65% solids in colors, and its data sheet gives a theoretical 1,040 sq ft per gallon at 1 mil. That matches 1,604 x 0.65. At the recommended 3 to 5 mils dry, the sheet lists 206 to 350 sq ft per gallon and warns that brush or roll application may need more coats to reach the film thickness.

For flake systems, use what the suppliers publish, and notice how much they differ:

SourceNumber
ArmorpoxyLight broadcast 0.25 to 0.5 lb per 100 sq ft, medium 0.5 to 2 lb, full broadcast 10 lb
WalttoolsFull broadcast about 8 sq ft per lb (a realistic range of 5 to 10 sq ft per lb), so 10 to 20 lb per 100 sq ft
Walttools, polyaspartic base and topBase 100 to 150 sq ft per gallon, topcoat 175 sq ft per gallon

Buy on the data sheet and the supplier's own coverage, add about 10% for waste, and keep a record of what each floor really used. Pot life is short (a few hours on the ArmorSeal sheet, and shorter when it is warm), so mix only what you can place.

Flake rates: how many pounds you need

"How many pounds of flakes per square foot?" is a question customers and new installers both ask. The honest answer is that it depends on how much of the floor you want covered. Armorpoxy publishes five levels of broadcast, in pounds per 100 sq ft:

Broadcast levelArmorpoxy's rate per 100 sq ftA 440 sq ft garage (the worked example)A 575 sq ft garage (Fixr's two-car size)
Light0.25 to 0.5 lb1.1 to 2.2 lb1.4 to 2.9 lb
Medium0.5 to 2 lb2.2 to 8.8 lb2.9 to 11.5 lb
Heavy2 to 4 lb8.8 to 17.6 lb11.5 to 23 lb
Super heavy4 to 9 lb17.6 to 39.6 lb23 to 51.8 lb
Full10 lb44 lb57.5 lb

Source: Armorpoxy's page on decorative color flakes. The suppliers do not agree. The Walttools figure earlier in this guide, about 8 sq ft per pound for a full broadcast, works out to 12.5 lb per 100 sq ft, with a range of 10 to 20. Confirm the rate with your own supplier before you order, and add about 10% for waste. Flakes are priced by the pound, so the level you sell is a materials line.

What the level costs. At the worked example's placeholder of $4.50 a pound, a medium broadcast at 2 lb per 100 sq ft on 440 sq ft is 8.8 lb, or $40. A full broadcast at 10 lb per 100 sq ft is 44 lb, or $198, so the difference is $158 in flake. At 0.65 that is $244 in price, and the full broadcast also takes broadcast and scrape-and-vacuum time that a light broadcast does not. Price the levels as options: Light, Medium and Full. Customers will pick a level when they see it on the quote.

Flakes are also grip. Armorpoxy's page says flakes work as extra aggregate that adds texture and slip resistance. More flake means a rougher feel and a tougher cleanup, which is worth telling the customer.

Epoxy vs polyaspartic: cost and labor

Customers ask for "epoxy" and sometimes mean a polyaspartic topcoat. The two differ in cure time and in how you schedule the work, and those differences set your labor.

EpoxyPolyaspartic
Walk on itAt least 12 hours3 to 4 hours
Drive on it3 full days24 hours
Typical installTwo to three days with recoat windowsOften one to two days
Pot lifeLongerShort. Bob Vila says it sets in about 10 minutes. Read your sheet.
Installed price in the sourcesFixr: $10 to $15 per sq ftFixr: $5 to $10. Bob Vila: $4 to $9

The cure times and the polyaspartic price in the last row come from Bob Vila's polyaspartic cost guide (updated January 2024). The installed prices come from Fixr (earlier in this guide) and Bob Vila, and the sources disagree on which one costs more: Fixr puts epoxy above polyaspartic, while Bob Vila says epoxy is the less expensive. That disagreement tells you what the label "epoxy floor" covers, which is anything from a thin roll-on kit to a full flake system. Price the system you install, from its materials and hours, not from a published per-square-foot number.

What changes your labor:

  • Number of visits. A system with an epoxy base needs a recoat window and often a second day. A polyaspartic system can be down in one day, and the customer can walk on it that evening. That is a trip you save. It is also a long day with a small window.
  • Pot life. When the material sets in minutes, you need enough people to place it, and you mix small batches. A third person is cheaper than a ruined floor.
  • Temperature. Check the slab temperature, not the air. Each product sheet has its own window. The weather rules guide shows how to read a data sheet's temperature limits and its forward-looking clauses, and the same reading applies to your coating's sheet.
  • Return to service. The customer's car has to stay out for days with epoxy. Say so on the quote.
  • Materials. Prices per gallon vary widely (Fixr lists epoxy materials at $30 to $150 a gallon). Use your supplier's price, not a guess.

The worked example below is a polyaspartic system done in two days. An epoxy base with a polyaspartic or urethane topcoat is also two days. Whichever you sell, write the walk-on and drive-on times on the quote.

Step 4: Production rates

No data sheet or trade group publishes a standard production rate for garage floors, and installers use very different systems. Suppliers describe the sequence (grind, repair, base, broadcast, scrape and vacuum, topcoat), and some systems are done in a day while others take two or three, because of recoat windows. One supplier lists a 4 to 6 hour recoat window for polyaspartic and a two-to-three-day schedule for epoxy bases.

So time your own. On the next five floors, record hours for each step and divide by square feet. Keep these apart: setup, grinding, repairs, cleaning, base coat, flake, scraping and vacuuming, topcoat, cleanup. Note how many people were on site and how many trips it took.

Step 5: From cost to price

Labor cost is wage plus burden. One estimating guide puts payroll taxes, workers' compensation and other costs at 25% to 40% of wages. Add labor, materials, equipment (grinder and vacuum, rented or spread over the jobs you use them on, plus diamond tooling) and protective gear to get direct cost. Then:

Price = direct cost / (1 - overhead % - profit %)

The reasons for dividing instead of adding a markup, and a markup vs margin table, are in How to price a deck stain job.

A worked example

The job: a two-car garage, 20 by 22 ft, which is 440 sq ft. Diamond grind, patch a few cracks, polyaspartic base coat, full flake broadcast, polyaspartic topcoat. Two days, two people.

Placeholders: labor costs $32.50 per person-hour (a $25 wage plus 30% burden). Overhead is 20% of price and profit is 15%. Prices for materials are made up for the example.

TaskCrew hours
Day 1: setup, mask, protect the walls1.0
Diamond grind, 440 sq ft2.0
Repair cracks and joints1.5
Vacuum and clean0.5
Base coat1.0
Flake broadcast1.0
Day 2: scrape and vacuum flake1.0
Topcoat1.0
Cleanup0.5
Total (2 people, so 19 person-hours)9.5

Materials and equipment:

ItemCost
Base coat at 125 sq ft per gal: 440 / 125 = 3.5, 3.9 with waste, at $120$468.00
Flake at 12.5 lb per 100 sq ft: 55 lb, 60.5 with waste, at $4.50$272.25
Topcoat at 175 sq ft per gal: 2.5, 2.8 with waste, at $110$308.00
Crack and joint filler$60.00
Diamond tooling and consumables$90.00
Grinder and vacuum, rented or spread over jobs$100.00
Respirators and protective gear$30.00
Total$1,328.25

From cost to price:

ItemAmount
Labor, 19 person-hours x $32.50$617.50
Materials and equipment$1,328.25
Direct cost$1,945.75
Price = $1,945.75 / 0.65$2,993
Overhead share (20%)$599
Profit share (15%)$449

Check it. $2,993 over 440 sq ft is about $6.80 per square foot. Fixr's epoxy range is $10 to $15 installed, so this is well under it, and it sits inside Fixr's $5 to $10 for polyaspartic. A gap that size usually means one of two things. Either you are leaner than the typical installer in Fixr's data, or your hours are too low. Check against your time log. If you are sure of your numbers, you can price at the market and keep the difference.

Write down what is not included: heavy crack repair, oil removal beyond a set area, moisture mitigation, a vapor barrier, replacing the control joints. Give a per-hour or per-foot rate for each, so the surprise on site is a change order, not a loss.

Common mistakes

  • Pricing the coating and not the grinding. Prep is the largest cost after materials.
  • Skipping the moisture test. A failed floor costs more than the job.
  • Using the thin-film coverage. At 10 or 12 mils a gallon covers about 130 to 160 sq ft, not 1,600.
  • Forgetting dust control. The vacuum, the respirators and the filters are job costs.
  • Underestimating flake. Full broadcast uses a lot. Buy what the supplier's coverage says, and log what you used.
  • No exclusions in writing. Oil, heavy cracks, moisture and spalls are extras.
  • Ignoring pot life. Mixed material that kicks before you place it is a loss.
  • Promising a schedule the chemistry can't keep. Recoat windows and cure times come from the data sheet, not your calendar.
  • Markup instead of margin. See the table in the deck guide.

How Chalk helps

This part is about our software.

  • Price book. Add your floor lines with a unit (sq ft, each, hour) and your price per unit, and add repairs and options as their own lines. Pick them on the quote. See Send a quote and get it approved.
  • Optional extras. Mark a flake upgrade or a polyaspartic topcoat as an Optional extra so the customer ticks what they want.
  • Deposit. Ask for a deposit on the quote, as a dollar amount or a percent. That is useful before you order materials.
  • Digital quote and invoice. Send the quote and the invoice as links the customer can open on a phone.

Sources

Prices and rates change and vary by region. Check the current version of each source.