Free tool

Crew capacity calculator: how much work can you take?

Enter your crews, the hours they work and how long a job takes. See how many jobs a week they can finish, and how long your backlog will last.

Adrian GluchowskiOwner of Superior Stain Solutions, builder of ChalkLast reviewed

Your team
Your jobs

Jobs a month

-
Jobs a week
-
Jobs per crew-day
-
Crew-days a month
-

Revenue it can carry

-
A crew-day is worth
-
Person-hours a week
-

Your backlog is booked out

-
At a pace of
-

The math

-

"How many lawns can a two-man crew mow in a day?" has no honest one-line answer, because it depends on the lawns, the drive and the crew. This calculator answers it from your own numbers. Enter how many crews you have, how long they work, how long an average job takes and how far they drive, and it tells you the jobs a day, a week and a month. Then you can see how much work you can sell before you are booked out, and when it is time to add a crew.

How it works

  1. Minutes per job. The time on site plus the drive and loading time for that job.
  2. Jobs per crew-day. The minutes in a working day divided by the minutes per job. A crew-day is one crew working one day.
  3. Work days a month. Days a week times 52, divided by 12, less the days weather takes from the whole team.
  4. Crew-days. The crews times the work days.
  5. Jobs a month. The crew-days times the jobs per crew-day. The jobs a week is that times 12 divided by 52.
  6. Revenue. The jobs a month times your average job price. A crew-day is worth the jobs per crew-day times the price.
  7. Backlog. The jobs you have sold and not done, divided by the jobs a week. It is how many weeks you are booked out.

A job that does not fit in the day carries over to the next. The result is a fraction of a job, and that is fine: a crew that does 2.3 jobs a day does 7 jobs in 3 days.

Worked example

The calculator opens on two crews of two people, working 5 days a week and 8 hours a day. An average job takes 3 hours on site and 25 minutes of drive and loading. The team loses 2 days a month to weather. An average job is $450, and 40 jobs are sold and not done.

  • Minutes per job: 3 x 60 + 25 = 205.
  • Jobs per crew-day: 8 x 60 / 205 = 2.341.
  • Work days a month: 5 x 52 / 12 = 21.67, less 2 weather days = 19.67.
  • Crew-days: 2 x 19.67 = 39.33.
  • Jobs a month: 39.33 x 2.341 = 92.1, about 21.3 a week.
  • Revenue: 92.1 x $450 = $41,445.00 a month, and a crew-day is worth $1,053.66.
  • Backlog: 40 / 21.3 = 1.9 weeks booked out.
  • Person-hours: 2 crews x 2 people x 5 days x 8 hours = 160 a week.

A one-person mowing route. One crew of one person works 5 days of 8 hours. A cut takes 30 minutes on site and 15 minutes of driving, and weather takes 3 days a month. That is 45 minutes a stop and 10.667 stops in a day. With 18.67 work days that is 199.1 stops a month, about 45.9 a week. At $55 a stop that is $10,950.50 a month. That is a ceiling. Few routes run every minute at that pace, which is why the next section matters.

When to add a crew

Your calendar tells you before this calculator does, but the numbers help you decide sooner.

  • A backlog that stays long, month after month. The calculator shows it as weeks booked out. Customers will wait longer for some work than for others, so decide how long a wait is too long for each kind of work, and watch that number.
  • Leads you turn down. If you say no or "next month" to work you want, the capacity is the limit, not the demand.
  • You are the crew. If the owner is still on the tools every day, add the person who frees the owner to estimate and sell.
  • Check the break-even first. A new crew adds fixed costs. Run the break-even calculator with the new crew in it and see that the sales you can sell cover it. See going from solo to a crew.

To test a change, put the new crew in, add the jobs a week to your lead plan in the revenue goal calculator, and see whether the leads are there to feed it.

Selling past capacity: the backlog rule

The weeks booked out is the number to keep in view when you sell. A simple rule:

  1. Decide how many weeks out you are willing to book for each kind of work. Customers will wait longer for a deck stain than for a window clean.
  2. When the backlog passes that, stop promising dates. Quote a window ("late April to mid May") and not a day.
  3. Take deposits on far-out work so the date is real for both of you. See Deposits for contractors.
  4. Look at your prices when you are booked out. If people wait and still say yes, the price may be too low.

Limits

  • Real days are bumpier than an average. Rain stacks up, a big job takes two crews, and a sick day takes someone out. Put weather and sick days into the days lost a month.
  • It treats every job as the same. If your work is a mix, run it for each kind or use the average of the mix.
  • People per crew does not change the jobs. The time on site is the whole crew's time, so a bigger crew only helps if the job time goes down. Enter it as the hours the crew takes with its real size.
  • It does not know about travel across a big service area. Put a typical drive in, or run it for each zone. The drive-time cost calculator shows what that drive costs. Tighter routes shorten it. See scheduling and routing for service crews.

FAQ

How many lawns can a two-person crew mow in a day?

It depends on the lawns. If a stop takes 30 minutes on site and 15 minutes to get there, a crew gets about 10 stops in an 8 hour day. Change the minutes to match your lawns and the answer changes. Time the last 10 jobs and use the average.

How many houses can one person clean in a day?

It depends on the size and the standard of clean. Time your own cleans and put the average in. Do not use a number from a forum.

How do I count a job that takes more than a day?

Put in the full hours it takes. It will come out as less than one job per crew-day, which is right.

Should the drive to the first job count?

Yes. The drive and loading time is added to each job, so every job carries its own drive. If your first job starts at the shop, take a few minutes off.

Does it include lunch and breaks?

Not unless you leave them out of the hours a day. Put the hours the crew is really working, not the hours they are on the clock.

Sources

  • All the math is multiplication and division on the numbers you enter. The 52 and 12 are the weeks and months in a year.
  • The starting numbers (2 crews of 2, 8 hours, a 3 hour job, 25 minutes of driving, 2 weather days, $450 a job, 40 jobs sold) are examples to replace with your own. They are not averages for any trade.