An exterior contractor's year has a shape: a slow start, a flood in spring, a lull in the heat, a second wave in fall, and a cliff in winter. The shops that do well do not react to each phase. They do the next phase's work one or two months early.
This calendar is for painters, stainers, washers, window and gutter crews, lawn and landscape crews and holiday lighting. Each month has a short table of what to sell, hire, fix and do about cash, then the extras and a note for warmer and colder places. It links to the guide with the details. Your climate sets the real dates, so the regional section shows how to find yours.
How to read it
- Sell is the work to quote and book that month, usually for one or two months ahead.
- Hire is crew: posting, interviews, training, who stays and who goes.
- Fix is the truck, the gear, your prices and your systems.
- Cash is tax dates, deposits, invoices and the reserve.
- Regions. Warmer places (the Southeast, the Gulf coast, the Southwest) start in late winter and slow down in summer heat. Colder places (the Northeast, the Midwest, the mountains) start later and finish earlier. The section below uses NOAA climate normals for one city in each of three regions.
- Tax dates are for 2027, for the 2026 tax year, and come from the IRS. Check them each year. They are on the year-end checklist.
- Weather rules come from the product data sheet. Minimum temperatures, dew point and dry times are in weather rules for exterior painting and staining.
When stain and paint season starts: Southeast, Northeast, Midwest
Two things decide the first and last exterior coating day of your year: the product's minimum temperature, and how cold your nights get. The first comes from the maker. The second comes from your local climate record.
What the data sheets say
| Product | What the maker says about temperature |
|---|---|
| Exterior acrylic paint: Sherwin-Williams Duration Exterior Acrylic | Air, surface and material above 35 F and at least 5 degrees above the dew point. Do not apply when air or surface temperatures may drop below 35 F within 48 hours. |
| Oil semi-solid stain: Sherwin-Williams SuperDeck Oil-Based Semi-Solid | Apply between 50 F and 90 F. Do not apply if temperatures will fall below 50 F or if rain is expected within 24 hours after application. |
| Oil solid stain: Cabot Solid Color Oil Decking Stain, 7600 series | Do not apply when air or surface temperature is below 50 F or may fall below 50 F for 48 hours after application. |
| Acrylic solid stain: Behr Premium Solid Color Waterproofing Stain and Sealer | The 2017 data sheet lists "Temperature Range: 35-90°F" under its cautions, without saying air or surface, and says not to use it if rain is expected within 24 hours. |
| Penetrating oil stain: Ready Seal | The maker's FAQ says there are no temperature restrictions for applying it. It asks for wood at 12% moisture or less. |
So there are two seasons, not one. A 35 F acrylic paint has a long one. A 50 F stain with a 48-hour clause has a short one, because it is the overnight low, not the afternoon high, that has to stay above 50.
What normal temperatures say
These are NOAA's 1991 to 2020 monthly climate normals: the average daily high and low for the month, in degrees F, at one airport per region.
| Month | Atlanta (SE) | Boston (NE) | Chicago (MW) |
|---|---|---|---|
| Mar | 65.9 / 45.3 | 45.5 / 31.1 | 47.0 / 31.0 |
| Apr | 73.8 / 52.5 | 56.4 / 40.8 | 59.0 / 40.3 |
| May | 81.1 / 61.3 | 66.5 / 50.3 | 70.5 / 50.6 |
| Jul | 90.1 / 71.8 | 82.1 / 66.0 | 84.5 / 66.4 |
| Sep | 83.9 / 65.9 | 73.1 / 58.2 | 75.5 / 57.1 |
| Oct | 74.4 / 54.9 | 62.1 / 47.5 | 62.7 / 45.4 |
| Nov | 64.1 / 44.2 | 51.6 / 37.9 | 48.4 / 34.1 |
Each cell is high / low. SE is the Southeast (Atlanta, Georgia), NE the Northeast (Boston, Massachusetts) and MW the Midwest (Chicago, Illinois). Sources: NOAA NCEI station normals for Atlanta Hartsfield, Boston Logan and Chicago O'Hare.
Southeast
Atlanta's normal low is above 50 F from April through October, and above 35 F in every month of the year (January's is 35.6 F). In practice:
- 50 F stains: April to October, with March and November going day by day.
- 35 F acrylic paints: usable days in most months, so mild winter weeks can carry exterior work.
- Summer: July's normal high is 90.1 F, the top of SuperDeck's range, and both Sherwin-Williams and Cabot warn against hot surfaces. Start early and follow the shade.
- Fall: October is often the best stain month of the year here.
Northeast
Boston's normal low reaches 50 F only in May (50.3 F), stays above it through September (58.2 F) and drops to 47.5 F in October. Above 35 F, it runs April (40.8 F) to November (37.9 F).
- 50 F stains: about late May to September in a normal year, plus the warm spells in early October.
- 35 F acrylic paints: from April, with the dew point and the 48-hour rule watched closely.
- The squeeze: fall is short. Book September and early October stain work in July and August, and schedule the longest jobs first.
Midwest
Chicago looks a lot like Boston: a normal low of 50.6 F in May and 57.1 F in September, then 45.4 F in October and 34.1 F in November.
- 50 F stains: about late May to September.
- 35 F acrylic paints: April to October. November's normal low is below 35 F.
- Spring: the thaw brings wet wood. Check moisture against the maker's limit (Ready Seal asks for 12% or less) before the first stain job.
January
Focus: cash, then booking spring.
| Job | What to do |
|---|---|
| Sell | Send past customers an early-booking offer with a real deadline and a deposit to hold the date. See book spring now, honestly. Quote interior, cabinet and repair work for the slow weeks. |
| Hire | Decide how many people you need for spring. Write the job post. Message last year's crew first. See hiring seasonal crew. |
| Fix | Service pumps, sprayers, mowers and trailers. Take down holiday lights and book next year's customers while you are there. |
| Cash | Pay the January 15 estimated tax (Friday, January 15, 2027) if you make them. Give your accountant the totals and the subs list: 1099-NEC forms are due Monday, February 1, 2027 (January 31 is a Sunday). |
Southeast: mild days can carry low-temperature paints when the data sheet allows. Northeast and Midwest: indoor work and planning.
February
Focus: get ready for the flood.
| Job | What to do |
|---|---|
| Sell | Follow up on every open estimate. See how to follow up on estimates. Close the early-booking deadline when you said you would. |
| Hire | Post the job. Interview, and run paid working interviews on dry days. Allow a few weeks from the first message to the first day. |
| Fix | Run the busy season prep checklist: prices, templates, equipment, lead handling and scheduling rules. Raise prices if your costs rose, with 30 days' notice to repeat customers. See how to raise your prices. |
| Cash | Deposits from the early-booking offer land now, at the bottom of the curve. See the worked example. Check insurance certificates and licenses before the first job. |
Southeast: leads start to come in. Northeast and Midwest: use the quiet to train.
March
Focus: first jobs and a rain plan.
| Job | What to do |
|---|---|
| Sell | Reply to new leads the same day if you can. In the spring rush the customer is calling several shops at once. Book spring gutter visits. |
| Hire | Make offers and do the paperwork early in the month. Run a paid training week in mid March: the steps for each job, the photos you want, how to talk to customers. |
| Fix | Write your weather rules down before the first rainy week. See rain delays and a weather policy. Put the data sheet limits for your main products on one card in each truck. |
| Cash | Buy materials for April in small orders, not all at once. |
Southeast: Atlanta's normal low is 45.3 F, so 50 F stains go day by day and 35 F paints are on. Northeast and Midwest: normal lows near 31 F; spring cleanups and mulch for lawn crews.
April
Focus: the busiest lead month in many places.
| Job | What to do |
|---|---|
| Sell | Book the second half of the season while the phone is ringing: maintenance plans and fall work. See maintenance plans. |
| Hire | A full crew in the field. Pair each new person with a lead. |
| Fix | Keep a weather buffer in every week. Overseed cool-season lawns in the spring window if you do that work: the University of Nebraska-Lincoln Extension gives April 1 to May 15, per our aeration and overseeding guide. |
| Cash | Pay the April 15 payment (Thursday, April 15, 2027): the 2026 return is due and the first 2027 estimate with it. April is the low point in the cash flow guide's example, because crews are buying and the money has not arrived yet. |
Southeast: stain season opens (normal low 52.5 F). Northeast and Midwest: 35 F acrylic paint can start; stains wait.
May
Focus: capacity.
| Job | What to do |
|---|---|
| Sell | Add-ons on every visit. See add-ons and upsells. Ask every happy customer for a review. See how to get Google reviews. |
| Hire | If you are booked six weeks out, add a crew or raise your price. Overbooking is how quality slips. |
| Fix | Look hard at the schedule. Give yourself one day off a week. |
| Cash | Invoice the day the job is done and collect deposits. See getting paid faster. |
Northeast and Midwest: stain season opens in late May in a normal year (normal lows 50.3 F in Boston, 50.6 F in Chicago).
June
Focus: heat and the mid-year check.
| Job | What to do |
|---|---|
| Sell | Quote late-summer work for customers who could not get on the spring schedule. |
| Hire | Check your crew's workload and morale. Burnout starts here. |
| Fix | Start early and finish by early afternoon. Duration says not to paint in direct sun, and SuperDeck asks for surface temperatures of 50 to 90 F, applied in shade. Run job costing on the first half: which jobs ran over? See job costing for contractors. |
| Cash | Pay the June 15 payment (Tuesday, June 15, 2027). |
Southeast: peak heat. Northeast and Midwest: peak season.
July
Focus: sell the second half.
| Job | What to do |
|---|---|
| Sell | Many shops see fewer calls in July and August, so quote fall jobs now. Send a maintenance-plan offer to this spring's customers. |
| Hire | Plan vacations and time off before September. |
| Fix | Mid-season equipment service. Do not wait for something to break. |
| Cash | Move cash into the reserve. Summer is when your account is fullest. See cash flow for seasonal contractors. |
Southeast: Atlanta's normal high is 90.1 F, so stain in the morning. Northeast and Midwest: book September stain work now; the fall window is short.
August
Focus: fall bookings.
| Job | What to do |
|---|---|
| Sell | Fall gutter cleaning and leaf cleanups. See how to price leaf removal and fall cleanups. Open holiday light bookings. See how to price Christmas light installation. |
| Hire | Recruit fall help, and decide who stays for winter. |
| Fix | Order lighting inventory. Count strands and price a roofline with the Christmas light calculator. |
| Cash | Send a late-summer offer to customers who still need exterior work done. |
Lawn crews: the University of Nebraska-Lincoln Extension names August 15 to September 15 as the best window for cool-season grass. For warm-season lawns, aeration is generally a late spring and early summer job, so check your state's extension office.
September
Focus: the second wave.
| Job | What to do |
|---|---|
| Sell | Book holiday lights: a deposit and an install date for each house. Book gutter visits for leaf fall. |
| Hire | Line up help for leaf season and holiday lights. |
| Fix | Watch the overnight lows against each product's 48-hour clause. Schedule the long jobs first. |
| Cash | Pay the September 15 payment (Wednesday, September 15, 2027). |
Northeast and Midwest: the last month with normal lows above 50 F (58.2 F in Boston, 57.1 F in Chicago). Southeast: the heat begins to ease.
October
Focus: finish exterior work before it is too cold.
| Job | What to do |
|---|---|
| Sell | Leaf cleanups in two or three visits, and gutter cleaning after most leaves are down. |
| Hire | Decide your winter plan: who keeps working, who is seasonal. See keep your crew through winter? Ask your best seasonal people back before they leave. |
| Fix | Review prices for next year while this season's numbers are fresh. |
| Cash | Build the winter cash forecast. The cash flow guide shows how in about an hour. |
Southeast: often the best stain weather of the year (normal low 54.9 F), so sell it. Northeast and Midwest: normal lows drop below 50 F (47.5 F and 45.4 F); 50 F stains are done except in warm spells.
November
Focus: lights and the year-end plan.
| Job | What to do |
|---|---|
| Sell | Install holiday lights. The worked example in the lighting guide has the job ready by December 1. Send the winter early-booking offer to past customers. |
| Hire | Go over ladder and roof safety with everyone on the lighting crew. |
| Fix | Final leaf cleanups. Winterize pumps and hoses. |
| Cash | Start the year-end checklist. Meet your accountant while you can still act before December 31: equipment purchases, estimated payments and the 1099 list. |
Midwest: the normal low falls below 35 F (34.1 F in Chicago), the end of the 35 F paint season too.
December
Focus: finish the year well.
| Job | What to do |
|---|---|
| Sell | Send a thank-you with a review request to this year's customers. Handle lighting service calls. |
| Hire | Meet each crew member, thank them and talk about next year. |
| Fix | Write next year's goal and your days off. Update this calendar with what you learned. |
| Cash | Finish the year-end checklist: chase unpaid invoices, collect W-9s, gather receipts and mileage. |
Example: January to May cash for a two-person stain crew
This is a made-up example with round numbers, to show why the early-booking deposit matters. Use your own numbers. The full method, with a 12-month forecast, is in cash flow for seasonal contractors.
Example shop: an owner and one helper who stain decks and fences.
- $8,000 in the bank on January 1.
- Fixed costs of $1,800 a month (truck, insurance, phone and software).
- The owner takes $4,000 a month in pay.
- Materials and the helper's pay come to 50% of each month's work, paid that month.
- Customers pay in full when the job is done.
- Estimated tax of $3,000 on January 15 and again on April 15.
- Work done: $2,000 in January, $3,000 in February, $12,000 in March, $20,000 in April, $24,000 in May.
Plan A: no deposits.
| Month | Cash in | Cash out | Bank at month end |
|---|---|---|---|
| Jan | $2,000 | $9,800 | $200 |
| Feb | $3,000 | $7,300 | -$4,100 |
| Mar | $12,000 | $11,800 | -$3,900 |
| Apr | $20,000 | $18,800 | -$2,700 |
| May | $24,000 | $17,800 | $3,500 |
Plan B: an early-booking offer. Ten past customers book $3,000 jobs for April and May, five in January and five in February. Each pays a 25% deposit ($750) to hold the date and gets $150 off. Five of the jobs are in April and five in May, so April and May each collect $3,750 less at the end (already paid as deposits) and $750 less for the discount.
| Month | Cash in | Cash out | Bank at month end |
|---|---|---|---|
| Jan | $5,750 | $9,800 | $3,950 |
| Feb | $6,750 | $7,300 | $3,400 |
| Mar | $12,000 | $11,800 | $3,600 |
| Apr | $15,500 | $18,800 | $300 |
| May | $19,500 | $17,800 | $2,000 |
The math, for Plan B's January: $2,000 of work plus five deposits of $750 is $5,750 in. Out is $1,800 fixed, $4,000 owner pay, $1,000 for materials and the helper (50% of $2,000) and the $3,000 tax payment: $9,800.
What it shows:
- Plan A is overdrawn from February to April, at worst $4,100 short in February. That is a credit card balance or a missed owner paycheck.
- Plan B never goes below zero. The deposits move $7,500 from April and May into January and February, when the account needs it.
- The offer costs $1,500 (ten times $150), which is why Plan B ends May $1,500 lower. That is the price of not borrowing. Do the math on your own margin first, as in off-season work.
- Some states limit deposits on home improvement work. See deposits for contractors before you set yours.
Print it: the one-page checklist
Print the checklist below and tape it inside the truck or by the desk. To print: use your browser's Print command (Ctrl+P or Cmd+P). The printout shows only the checklist, on one page.
The exterior contractor's year: one-page checklist
Tick each line as you do it. Move the dates to fit your climate. From chalkcrm.com/guides/exterior-contractor-calendar.
January
- Sell: early-booking offer to past customers
- Hire: headcount, job post, message last year's crew
- Fix: service gear, take down lights
- Cash: Jan 15 tax, 1099-NEC by Feb 1
February
- Sell: follow up every open estimate
- Hire: post, interview, working interviews
- Fix: busy season checklist, new prices
- Cash: collect spring deposits, check insurance
March
- Sell: same-day replies, book spring gutters
- Hire: offers, paperwork, training week
- Fix: written rain policy, data sheet card
- Cash: buy materials in small orders
April
- Sell: maintenance plans and fall work
- Hire: full crew, new people with a lead
- Fix: weather buffer in every week
- Cash: Apr 15 return and estimate
May
- Sell: add-ons and review requests
- Hire: booked six weeks out? Add a crew or raise price
- Fix: one day off a week
- Cash: invoice the day the job is done
June
- Sell: quote late-summer work
- Hire: check workload and morale
- Fix: early starts, mid-year job costing
- Cash: Jun 15 tax
July
- Sell: quote fall jobs, plan offers
- Hire: plan time off
- Fix: mid-season equipment service
- Cash: fill the reserve
August
- Sell: gutters, leaves, open light bookings
- Hire: fall help, who stays for winter
- Fix: order lighting inventory
- Cash: late-summer offer
September
- Sell: light deposits and install dates
- Hire: help for leaves and lights
- Fix: watch lows against 48-hour rules
- Cash: Sep 15 tax
October
- Sell: leaf cleanups, fall gutters
- Hire: winter plan, ask the best back
- Fix: next year's prices
- Cash: winter cash forecast
November
- Sell: install lights, winter booking offer
- Hire: ladder and roof safety talk
- Fix: final cleanups, winterize gear
- Cash: year-end checklist, see the accountant
December
- Sell: thank-yous and review requests
- Hire: talk to each person about next year
- Fix: next year's goal and days off
- Cash: chase unpaid invoices, W-9s, receipts
Tax dates are for 2027 (IRS). Temperature limits come from each product's data sheet. General guidance, not tax or legal advice.
FAQ
When should an exterior contractor start marketing for spring?
In January, with the people who already know you. Send past customers an early-booking offer with a real deadline and a deposit to hold the date, then follow up on every open estimate in February. By March, answer new leads the same day, because the spring rush starts first in the Southeast. The busy season prep checklist has the full list, and off-season work has the math on an early-booking discount.
What is the minimum temperature to apply exterior stain?
It depends on the product, so read its data sheet. Sherwin-Williams says to apply SuperDeck oil-based semi-solid stain between 50 F and 90 F, and not if temperatures will fall below 50 F. Cabot says not to apply its 7600 series solid color oil decking stain when the air or surface is below 50 F or may fall below 50 F for 48 hours after application. Ready Seal's FAQ says there are no temperature restrictions for applying its stain. More products are in weather rules for exterior painting and staining.
What can exterior contractors sell in winter?
Interior repaints, cabinets and repairs, holiday light installation and takedown, gutter and leaf work late in the fall, and next spring's jobs booked now with a deposit. Maintenance plans and re-stain cycles sold in winter fill next year's calendar. The list, by the gear you already own, is in off-season work for exterior contractors.
When should I hire seasonal crew for spring?
Start in January. Decide how many people you need and message last year's crew, post and interview in February, make offers in early March and run a paid training week in mid March, so a full crew is in the field in April. Allow a few weeks from the first message to the first day, so a shop that starts looking in April is often still hiring in May. See hiring seasonal crew.
When does staining season start in the Northeast and Midwest?
For a stain that needs 50 F, usually not before late May. In NOAA's 1991 to 2020 climate normals the average daily low in May is 50.3 F at Boston Logan and 50.6 F at Chicago O'Hare, and in April it is 40.8 F and 40.3 F. An acrylic paint rated down to 35 F can start in April. A normal is an average, so check the forecast lows against the product's 48-hour rule before each job.
When does painting and staining season start in the Southeast?
About a month earlier than in the North. In NOAA's 1991 to 2020 normals the average daily low at Atlanta's airport is 45.3 F in March and 52.5 F in April, so 50 F stains open up in April and March goes day by day. July's normal high there is 90.1 F, the top of SuperDeck's 50 to 90 F range, so summer staining is a morning job.
How Chalk helps
This part is about our software. Skip it if you only want the calendar.
- Rain. Rain day on the calendar moves a rained-out day's work visits in one go: you pick which visits move and where they go, and choose whether customers are told. See how to reschedule a whole day for rain.
- Early-booking offers. A timed offer takes money off if the customer approves before a clock runs out, with reasons such as Off-season to show with it. See optional extras, timed offers and quote expiry.
- Repeat work. Set a number of months until a type of work is due again, and finished work becomes a lead again. The Repeat-work text automation is off until you add it. See automations.
- Yearly, 6-month and 3-month visits can repeat from one job. See recurring visits.
- Seasonal crew. Each person after the owner is a seat at $14 a month, and Remove a seat takes it off the next bill. See add your team and plans and billing.
- Last year's numbers. Reports > Money shows money collected by month for the last 12 months, which shows your own curve. See reports.
Sources
- IRS, Estimated taxes, Estimated tax FAQ and Instructions for Forms 1099-MISC and 1099-NEC: payment dates and the January 31 rule, which moves to February 1, 2027 because January 31 is a Sunday.
- Sherwin-Williams, Duration Exterior Acrylic Flat product data sheet and SuperDeck Oil-Based Semi-Solid Wood Stain product data sheet.
- Cabot, Solid Color Oil Decking Stains #7600 Series technical data.
- Behr, Premium Solid Color Waterproofing Stain and Sealer technical data sheet, revised February 2017.
- Ready Seal, frequently asked questions.
- NOAA National Centers for Environmental Information, U.S. Climate Normals, 1991 to 2020 monthly normals for Atlanta Hartsfield (USW00013874), Boston Logan (USW00014739) and Chicago O'Hare (USW00094846).
- University of Nebraska-Lincoln Extension, Lancaster County, spring lawn overseeding, as used in our aeration guide.
- The cash example's shop and every dollar figure in it are made up. The math is arithmetic you can check line by line.
- Month-by-month timing is general contractor practice and varies by climate and trade. Treat it as a starting point.