If your trade lives outdoors, winter is not a vacation. Rent, trucks and insurance keep arriving, and your crew still needs a paycheck. The contractors who get through a slow season well do four things before it starts: they plan the cash, they pick work that fits the gear they own, they book spring early, and they turn last year's customers into this year's repeat work.
It is October, so there is time. This guide gives you the numbers and a plan.
Plan the cash first
Before looking for winter work, find out how much money you need to get through the slow months. Add up what leaves your account whether or not you work: truck and trailer payments, insurance, phone and software, equipment upkeep, marketing and your own minimum pay. For a small owner-operator in our example that is $5,600 a month, so three slow months need $16,800. If the busy season brings in $180,000, setting aside 9.5% of every invoice ($17,100) covers it. Move the money to a separate savings account when each invoice is paid so it doesn't get spent.
Two more things to plan for:
- Taxes. Sole proprietors, partners and S corporation shareholders generally must pay estimated tax if they expect to owe $1,000 or more when they file. The year has four payment periods, each with its own due date. See the IRS estimated taxes page. Pay as you go in the season, so the bill doesn't land in the slow months. This is general information, not tax advice.
- Equipment and repairs. Winter is the time to fix, sharpen, service and replace. Put it in the plan so it doesn't surprise you in April.
The full plan is in cash flow for seasonal contractors: a 12-month forecast with a downloadable sheet, how to size a reserve, deposits and terms, steady owner pay and credit as a backstop. If the number is bigger than your savings, you have two options: bring in winter revenue, or cut costs. The rest of this guide is about the first. For the whole year laid out month by month, see the exterior contractor's year.
Interior and cabinet work
Painters and stainers have the easiest winter: take the work inside.
- Interior repaints. Rooms, ceilings, trim, doors. Customers think about it in the holidays and in January.
- Cabinets. Higher value per job, and the work is done in a shop or the home. See how much to charge for cabinet painting per door.
- Drywall repair and touch-up before painting. See how to price drywall repair.
- Garage floors and basements if you do epoxy.
- Rental turnovers for property managers, which can be steady work all year.
Interior work needs different tools and a different estimate. Price it with your own production rates, and start with a few jobs before you promise a crew full-time hours. The interior painting pricing guide has the room math.
Add-ons that fit your gear
Think about what you already own and what it can do in the cold.
| Your gear | Winter work to consider | Watch out for |
|---|---|---|
| Pressure washer, hoses, ladders | Gutter cleaning late in the fall, house wash in mild climates, holiday lights | Freezing temperatures break equipment and make ice. Work at height needs the right insurance. |
| Ladders, a truck, a crew | Holiday light installation and takedown. See how to price Christmas light installation, and count strands and price a roofline with the Christmas light calculator | Roof work, electrical safety, and an early start in the fall |
| Mowers, trimmers, blowers, a trailer | Leaf cleanups and fall cleanup. See how to price leaf removal and fall cleanups | Disposal costs and weather |
| A truck and a crew | Dormant pruning, mulch and gravel delivery, and equipment service for others | Check your state for tree-work and pesticide rules |
| A truck and a plow | Snow removal | Liability is high and insurance may need an add-on. Ask your agent first. |
| Brushes, sprayers, a van | Interior painting, small repairs, drywall | Estimating a different kind of work |
Start small. Offer one new service to your best past customers before you advertise it to everyone. The licenses and insurance basics guide covers the questions to ask before you add work at height, snow or chemicals.
Keep your crew through winter?
Keeping a crew costs money; losing them costs more in the spring, when you have to find, train and rely on new people. The decision comes down to whether your winter work pays for their hours.
An example. Two helpers, 20 hours a week each, at a loaded cost of $30 an hour. You bill their labor at $65 an hour (before materials, using a number close to our hourly rate guide).
Weekly cost: 2 x 20 x $30 = $1,200
Weekly labor billing at 100% billable: 2 x 20 x $65 = $2,600
Break-even billable share: $30 / $65 = 46%
| Share of their hours you can bill | Weekly billing | Weekly result | Over 12 weeks |
|---|---|---|---|
| 40% | $1,040 | -$160 | -$1,920 |
| 46% | $1,196 | -$4 (break-even) | -$48 |
| 70% | $1,820 | +$620 | +$7,440 |
| 100% | $2,600 | +$1,400 | +$16,800 |
If you can bill about half of their hours, you break even and keep a trained crew. Below that you are paying for retention, which can still be worth it for a crew you trust. A smaller crew with fewer hours is another option. Ask your people. Some prefer a lighter winter, or want to take a second job for a few months and come back in the spring. Hiring again in spring? See hiring seasonal crew.
Book spring now, honestly
Winter is the best time to sell spring. The calendar is empty, customers are thinking about next season, and a deposit now is cash in the slow months.
An early-booking offer can work, but do the math first. At a 30% margin, a 5% discount takes 16.7% off the profit of that job:
Job: $4,000, cost $2,800 (70%), profit $1,200
After 5% off: $3,800, profit $1,000
Profit falls by $200, or 16.7%
So when is it worth it? When it moves a job into a week that would otherwise be empty, brings the deposit in months earlier, or helps you fill the first weeks of the season. It is not worth it for jobs that would have booked anyway.
Rules for an honest offer:
- Make the deadline real. "Book by January 31 for April work" works only if you hold to it. Do not invent a deadline. A made-up countdown erodes trust.
- Keep the price fair for everyone else. Your regular price stays the same.
- Say what they get, in dollars: "$150 off a job booked by January 31."
- Take a deposit to hold the date. See deposits for contractors.
- Offer it to past customers first. They already trust you.
A sample text for past customers:
Hi [first name], it's [your name] at [business]. We're booking [spring] jobs now, and past customers get first pick of dates. If you'd like [your deck stained / your windows cleaned / your lawn plan], book by [date] and we'll take $[amount] off. Reply and I'll send a quote.
Sell maintenance plans and re-stain cycles
Repeat work is the cheapest work you will ever sell. The customer already knows you, the property is measured, and they are due.
A worked example. You have 600 past staining customers. On a three-year cycle, about a third are due in any given year.
600 customers / 3 = 200 due this year
15% say yes when you reach out: 200 x 0.15 = 30 jobs
Average job $1,800: 30 x $1,800 = $54,000
The 15% and the $1,800 are guesses. Replace them with your own. Even if the real rate is half, it is a lot of revenue from a list you already own.
The short version of how to run it: list past customers by job type and finish date, work out who is due this year and next, reach out in the slow season, and offer a plan for the work that repeats (gutters, a yearly wash, a seasonal lawn plan). Typical re-service cycles with their sources, how to price a plan (including the math on the discount), monthly versus per-visit billing, and what goes in the agreement are in maintenance plans for service businesses.
When you raise prices, tell recurring customers 30 days ahead. See how to raise your prices.
Winter admin
The best use of an empty week:
- Review last season. Which jobs paid, which did not. See job costing.
- Update your prices and your price sheet for the new year.
- Update your paperwork: contracts, insurance certificates, licenses, your W-9.
- Fix and service the equipment, and replace what is near the end of its life.
- Clean up your customer list: correct addresses, phones, emails, notes on gates and dogs.
- Follow up on old estimates that never got a yes. See how to follow up on estimates.
- Take training: lead-safe certification, a pesticide license, safety courses.
- Send a thank-you with a review request to last season's customers. See how to get Google reviews.
- Plan the spring calendar and block time for rain. See rain delays and a weather policy.
How Chalk helps
This part is about our software. Skip it if you only want the plan.
- Work comes back around. Set how many months until a type of work is due again, and finished work becomes a lead again. Set it per job type with Due again after under Settings > Lists > Job types, or a shop-wide default with Work comes back around under Settings > Hours and calendar. For example, 24 months for a re-stain. See bring back repeat work.
- A text when it's due. The Repeat-work text card (under Settings > Automations > Add automation) texts the customer when finished work comes due. It is off until you add it.
- Yearly and seasonal visits. A job can repeat every week, every 2 weeks, every month, every 3 months, every 6 months or every year, and each visit can be billed on its own if you choose. See how to set up recurring visits.
- An early-booking offer with a real deadline. A timed offer takes money off if the customer approves before a clock runs out, and you can pick a reason such as Off-season to show with it. See optional extras, timed offers and quote expiry.
- See the repeat share. Reports has a Repeat work against new chart over the last 12 months. See reports.
Chalk does not sell the work for you. You choose the offer and the customers.
Sources
- IRS, Estimated taxes
- The cash, crew and discount examples are arithmetic from made-up numbers. Replace them with yours.
- The 600-customer example is made up. Service cycles and their sources are in maintenance plans for service businesses. Check the data sheet for your product and your own results.