Most of what it costs to win a job is already spent by the time the customer says yes: the ad, the call, the estimate visit, the drive. Anything else you sell them on the same visit starts from a much better position. Offered well, an add-on is a favor to the customer, because it saves them from finding and trusting a second contractor.
Offered badly, it is the thing people remember about you for the wrong reasons. This guide shows how to find add-ons that fit, price them fairly, offer them without pressure, and get the yes in writing.
Add-ons, upsells and follow-ups
Three different things, and each is offered differently.
- An upsell is a better or bigger version of what they are already buying. A second coat, a longer-lasting product, the whole fence instead of one side.
- An add-on is an extra service on the same visit. Gutter cleaning on a house wash, a driveway wash on a deck job.
- A follow-up is a different service later. A maintenance plan, a fall cleanup, a spring check. Plans have their own guide: maintenance plans.
The best add-ons use the gear you already own and the crew you already sent. If you need to buy a machine or learn a trade to sell it, that is a new service, not an add-on.
Add-ons by trade
Start with the work your customers already ask about in passing.
| Trade | Add-ons that fit | What they use |
|---|---|---|
| Painting | Trim and doors, garage door, caulk and seal, a fence or railing | Same sprayer, ladders and prep |
| Deck and fence staining | A wash and brightener first, nearby railing, a pergola, a gate | Same stain and washer |
| Pressure washing | Driveway, walkway, patio, fence, gutter fronts, trash can pad | Same washer and hoses |
| Gutter cleaning | Downspout flush, small repairs, a fascia wash, a roof debris blow-off | Same ladders and truck |
| Window cleaning | Screens, tracks and sills, skylights, a hard water treatment | Same poles and water |
| Lawn and landscape | Aeration, overseeding, leaf cleanup, mulch, shrub trimming | Same trailer, a rented machine if needed |
| House cleaning | Oven, fridge, interior windows, baseboards, laundry | Same supplies and time on site |
| Holiday lighting | Timers, tree wraps, extra strands, takedown and storage | Same ladders and inventory |
| Handyman | A short list of small fixes, caulk, door adjustments, detector batteries | Same tool bag |
Pick three or four per trade. A long menu makes people feel they are being sold to.
Why add-ons earn more than the same job alone
A worked example, with made-up numbers. A one-off gutter cleaning is $180 and costs you $126 to do. Part of that cost is the trip and setup: say $44 (half an hour for two people at a loaded $31 an hour, plus fuel). When your crew is already at the house for a wash, that $44 is already spent.
| Gutters as a separate job | Gutters as an add-on | |
|---|---|---|
| Price | $180 | $150 |
| Cost to do | $126 | $82 |
| Profit | $54 | $68 |
You can give the customer $30 off the add-on and still earn $14 more. They get a better price and no second appointment, and you get the money. That is the logic of an honest add-on: shared costs make it cheaper for both of you.
The margin math is the same as in job costing. Use your own numbers.
When to offer: on the quote, on site, after
On the quote. The cleanest place. List the extras the customer can tick, and mark the ones you recommend. They see the price before they decide, there is no pressure, and what they tick is what they agree to. See good, better, best pricing for how extras differ from full packages.
On site. The customer sees something the quote did not cover, or you do. Describe it, give a price, and wait for a yes before you start. See the next section.
After. The best time is a week or two after the job, when the customer is happy. A text works: "Your deck looks great. I noticed your fence is due for the same treatment. Want a price?" Another good moment is the slow season, when the schedule is open.
How to walk a customer through the options is in how to present an estimate.
Say it without being pushy
The goal is to inform, not to close.
- Point at something real. "The gutters on the north side are full of leaves, and they drain onto the wall we just painted." Only recommend what the house needs. Never offer a repair you would not want done to your own home.
- Make it easy to decline. "No pressure. I can give you a price now, or leave it."
- Give the price in one sentence. "Cleaning the gutters while we are here is $150."
- Ask once. If they say no, thank them and move on. You can mention it in the follow-up text, once.
- Do not mention savings you do not have. If you say "since we're already here," the price should be lower than a separate visit.
A text to send after the job:
Hi [first name], it's [your name] at [business]. Thanks again for having us out. While we were there I noticed [specific thing]. We can [add-on] for $[price] if you'd like. Just reply YES and I'll put you on the schedule. No rush.
Price small add-ons with a minimum
Small add-ons are easy to underprice, because the hour looks small. Count the costs.
Direct cost: 2 people x 1 hour x $31 loaded rate = $62
Supplies: $8
Total direct cost: $70
Price = direct cost / (1 - overhead - profit)
= $70 / (1 - 0.12 - 0.30)
= $70 / 0.58
= $120.69 -> round to $125
That uses an overhead of 12% and a profit target of 30%. Use yours. The method is the same as the one in the job costing guide.
Two rules for small ones:
- Set a minimum add-on charge, a number below which it is not worth the time to stop and do it. The math above is a good minimum for a one-hour add-on.
- Check the extra visit. If an add-on needs a return trip, price it as its own visit. See should contractors charge for estimates for how to think about trip costs.
On-site add-ons: get the yes in writing
The riskiest moment is the "while you're here" request that you agree to out loud. A week later it is "I thought that was included."
The rule: no extra work without a written yes. It takes one text.
- Describe it and price it, in a message: "To clean the gutters and flush the downspouts on the north side: $150."
- Ask for a reply that says yes. A text back, or an email, counts as a dated record.
- Add it to the job and the invoice, so the paperwork matches.
- For bigger changes, use a change order. See the free change order form.
If the customer says no, do not argue and do not do it for free to be nice. A free favor teaches people that you do not charge.
Track what sells
You cannot improve what you do not count. Once a month, write down for each add-on:
| Add-on | Times offered | Times accepted | Rate | Money earned |
|---|---|---|---|---|
| Gutter cleaning on house wash | 20 | 7 | 35% | $1,050 |
| Driveway wash on deck job | 14 | 3 | 21% | $540 |
Those rows are made up. What matters is what yours say:
- An add-on offered often and rarely accepted is priced wrong or mismatched.
- An add-on accepted most of the time may be underpriced.
- One that nobody buys is dead weight. Drop it.
Also check the average job size before and after you start offering add-ons. If it does not rise, you are not offering them or they are not wanted.
How Chalk helps
This part is about our software. Skip it if you only want the method.
- Optional extras the customer ticks. On a quote, press + Optional extra, or tick Optional, customer decides on a line. It is not in the total until they tick it. Tick We recommend it to show a We recommend this badge. That badge never ticks the extra for them. See optional extras, timed offers and quote expiry.
- Pull items from your price book so add-ons carry the same price every time. See set up your price book.
- A yes over the phone. Tick Customer took this extra on that line, and it counts in the total.
- Extras they passed on stay on their page after they approve, so they can ask for one later.
- A signed yes for a change. Chalk has no separate change order. Open the quote's More menu, press Duplicate, change the copy and send it, or edit the job's charges on the What we're charging card. See change a quote after it is sent.
- See which work pays. Reports > Money has a Which work pays chart of sold value by job type. See reports.
Chalk does not count how often an add-on is offered or accepted. Use a sheet like the one above.
Sources
- The examples in this guide (gutters, the $44 shared cost, the $125 minimum, the tracking table) are made up and use simple arithmetic. The loaded labor rate of $31 an hour and the price formula come from our job costing guide and hourly rate guide.
- Licensing and insurance questions: see contractor licenses and insurance basics and your state's rules.