Crew and hiring

Training a new crew member: a 30-day plan

A 30-day training plan for new crew: day-one safety, ride-alongs, a skills ladder with sign-offs, checklists they can follow alone, and when to raise pay.

Adrian GluchowskiOwner of Superior Stain Solutions, builder of ChalkLast reviewed 10 min read

On this page

The most common reason a new hire fails is not the hire. It is the first two weeks. Nobody told them what "done" looks like, so they guessed. Nobody showed them the safe way to set a ladder, so they set it the way they always had. The owner got busy, said "just watch Mike," and Mike was busy too.

By week two the new person feels lost and the owner feels let down. By week four one of them quits.

A written 30-day plan fixes most of this. It takes about two hours to build once and about 30 minutes a week to run. This guide gives you the plan, a skills ladder with sign-offs, and rules for when to raise pay.

Day one: safety and the basics

Do not start with the work. Start with the three things that can hurt someone or lose a customer.

1. Safety (about 90 minutes of the first morning). Cover only what this job needs, in the order they will meet it:

  • Ladders. Inspect it before use. Set it on solid, level ground at a safe angle. Keep three points of contact. Never overreach. Never stand on the top rungs. OSHA's construction rule requires an employer to provide training for each employee who uses ladders, delivered by a competent person, covering fall hazards, setup and use, and a ladder's load limit (29 CFR 1926.1060). For non-construction work such as cleaning and lawn care, OSHA's general industry rule (29 CFR 1910.30) also requires ladder training.
  • Chemicals. If your crew uses bleach mixes, brighteners, strippers, solvents, stains or cleaners, they need to know what is in them. The Hazard Communication standard requires employers with hazardous chemicals to keep labels and safety data sheets (SDS) and to train workers on them. Read a real label and a real SDS together on day one. See OSHA's Hazard Communication page.
  • Respirators. If you require respirators, OSHA's standard calls for a written program, a medical evaluation, a fit test, and training, all at no cost to the worker. If workers only use dust masks voluntarily, the rules are lighter. See 29 CFR 1910.134. Do not hand someone a respirator and call it done.
  • Heat. New and returning workers need time to adapt to heat. OSHA advises water, rest and shade, shorter shifts and more breaks in the first days, and training for supervisors and workers on heat illness symptoms. See OSHA's heat page.
  • Lifting, power equipment, traffic and driveways. The usual ones for your trade.
  • What to do if something goes wrong. Who to call, where the first aid kit is, and that you want a call, not a cover-up.

If you want an outside set of eyes, OSHA runs a free, confidential On-Site Consultation Program for smaller businesses, separate from enforcement. It is offered through state agencies or universities.

2. The basics of the business (about 30 minutes).

  • How the day works: start time, where to meet, what to bring, what to do if sick.
  • How you talk to customers: hello, name, "we'll take good care of this."
  • What the phone is for: work, not social.
  • The three big rules (example): safety first; call before you change anything; photos at the start and the end.
  • How and when they are paid, and how to clock in.

3. A walk-through of one finished job (about 30 minutes). Show a photo set of a job you are proud of. "This is what done looks like."

Pay them for all of this. Training that is part of the job, or happens in work hours, is generally work time under federal rules. The Department of Labor says that time spent at training need not be counted as work only when it is outside normal hours, truly voluntary, not job-related and without productive work. A new-hire orientation does not meet them. See 29 CFR 785.27.

Week one: shadow and do

The aim of week one is to see the full job from start to finish, and to do small pieces of it with a coach beside them.

DayWhat they doWhat you do
1Safety, basics, ride along, watch the full jobExplain what you are doing as you do it
2Set up and tear down: load, unload, cover, move, clean upShow once, watch once, correct once
3Do the first simple task alone, with you in sightSay what "good" looks like before they start
4Repeat it faster, add a second taskCheck the quality at the end of each task
5A short written quiz, or a verbal walk-through, plus a first reviewAsk what is confusing. Give one thing done well and one to fix

A rule for the coach: show, tell, watch, correct. Show the task. Tell why each step matters. Have them do it while you watch. Correct what you see right away and kindly.

Pair them with your steadiest crew member, not the fastest. Fast people show shortcuts. Steady people show the standard.

Weeks two to four: the skills ladder

After week one, move from watching to owning. Use a short list of skills, in the order that builds on itself, and a clear sign-off for each.

Here is a skills ladder for a painting or staining crew. Make one for your trade.

LevelSkillsSign-off by
1. HelperLoading and unloading, protecting floors and plants, masking, cleanup, ladder setup, basic safetyLead
2. Prep techWashing and scraping, caulking, patching, sanding, moving furniture safely, reading the work orderLead or owner
3. Cut-in techBrush and roller finish, clean lines, matching sheen and color, trim workOwner
4. Spray techSetting up and cleaning a sprayer, masking for overspray, even coverage, wind and weather callsOwner
5. LeadRuns a crew, keeps the schedule, talks to the customer, does the walkthrough, trains othersOwner

Other trades look similar. A lawn crew's ladder might be: loader → trimmer → edger → mower → route lead. A cleaning team's might be: kitchen and bath → dusting and floors → full house → team lead.

Rules for a good ladder:

  • Keep it short. Four to six levels.
  • Name concrete skills, not attitudes. "Cuts a straight line against the ceiling" beats "good attitude."
  • Make each sign-off a real test. Do the task on a real job while the person signing off watches. A pass is a pass, and a fail is a retry next week.
  • Put the steps on paper. One page per level. Write the date and who signed.

Sign-offs, not vibes

A sign-off is a short check that a person can do a task alone to your standard. Without it, "he's coming along" is a feeling, and raises are a fight.

A one-page sign-off sheet:

Name: ________________   Start date: ________
Skill                                  Date   Signed by   Notes
1. Sets and takes down ladder safely   ____   ________    ______
2. Masks a window and a door           ____   ________    ______
3. Washes a section without streaks    ____   ________    ______
4. Patches and sands a small hole      ____   ________    ______
5. Cuts in a ceiling line              ____   ________    ______
6. Cleans up and walks the site        ____   ________    ______

How to run a sign-off:

  1. Tell them a week in advance which skill and when.
  2. Do it on a real job.
  3. Watch without coaching, unless there is a safety problem.
  4. Write what you saw, not just pass or fail.
  5. If they miss it, say why and set a date to try again.

Checklists that train for you

A good checklist is a trainer who is on every job. It does not replace your coaching, but it covers the same ground every time.

  • One checklist per job type, short enough to read on a phone. Eight to twelve items.
  • Write in the order of the work. Not alphabetical, not by importance.
  • Make the few that matter "required." A list of twenty required boxes gets ticked without being read.
  • Include a photo item where proof matters: "After photos taken."
  • Use the same words as your sign-offs, so the lists match the training.
  • Review them each winter and remove what no one uses.

Example, for a house wash:

  • [ ] Walked the property and photographed existing damage
  • [ ] Plants wet and covered; windows and vents closed
  • [ ] Mix checked and written on the work order
  • [ ] Applied, dwelled and rinsed top to bottom
  • [ ] Walked the whole house for streaks
  • [ ] After photos taken (required)
  • [ ] Gate closed, hose coiled, trash gone

See SOPs your crew will actually follow for how to write the steps behind each box.

Feedback that sticks

New people hear most of what you say once and forget it. Make feedback short, specific and close to the moment.

  • Use a simple pattern: what I saw, why it matters, what to do next time. "I saw the ladder feet on the soft dirt. A ladder can slide on soft ground. Next time, put a board under it."
  • Correct in private, praise in public.
  • Say a good thing every day. Name it: "That tape line was straight."
  • End each week with 10 minutes. Two questions: "What went well?" "What is still confusing?"
  • Write down what you promised. If you said you would check in on Friday, do it.
  • Don't fix it for them. If you redo their work in front of them, they learn that effort does not matter.

For the first month, check with them on days 3, 7, 14 and 30. Short chats, five minutes each.

Raises tied to skills

People stay when they can see the next step and the pay that goes with it. A sign-off ladder makes that easy.

An example pay ladder (all numbers are examples):

LevelHourlyRaise when
Helper$18.00Start
Prep tech$20.00Signed off on levels 1 and 2, usually 30 to 60 days
Cut-in tech$22.00Signed off on level 3
Spray tech$24.00Signed off on level 4
Lead$26.00Signed off on level 5, plus running a crew for 30 days

Compare that with the cost of a raise. A $2 an hour raise for a person who works 1,800 hours is $3,600 in wages. With employer payroll taxes, unemployment and workers' comp on top (about 17% in the seasonal helper example in Hiring your first helper, and your own rates will differ), it costs you closer to $4,200 a year. If that person can now do a task that used to need you, or that you used to redo, it pays for itself fast.

Rules:

  • Publish the ladder. Everyone sees the same steps and the same pay.
  • Don't promise raises on a date. Promise them on sign-offs.
  • Raise on the day they pass, not at the next review.
  • If someone is stuck, say why, and say what to practice.

Pay rules still apply as people move up: more skill does not make a crew member exempt from overtime. See day rate vs hourly crew pay.

How Chalk helps

This part is about our software. Skip it if you only want the training plan.

  • Checklists for each job type. Under Settings > Lists > Checklists, make a checklist and pick where it goes: Default for jobs, Default for quote appointments or Manual only. You can also set one on a job type under Settings > Lists > Job types. Items can be a Checkbox, a Note or a Photo, and each can be Required.
  • Required items gate "Mark it done". On the crew's finish sheet, Mark it done stays grey until every required item is complete. This only applies on the crew's finish sheet. The office pressing Mark job complete, ChalkBot and the API do not check. See Run a job from approval to invoice.
  • Crew Today. Each stop shows the address, the notes for the crew (gate codes, the dog, where to park), what the customer asked for and what to do, with no prices. See Crew's My Day.
  • Prices stay hidden. Field crew do not see job prices unless you switch Job prices on for their role. See Roles and permissions.

Chalk does not run a training program, keep sign-off sheets or track skills. Keep the sign-off sheet on paper or in a shared document for now.

For the paperwork and first-week items, use the crew onboarding checklist. The top rung of the skills ladder is running a crew: see making someone a crew lead.

Sources